From Red Tag to Green Light—Fast, Accurate, and Fully Approved.
We specialize in fixing red tags, drafting correction plans, and
Get Approved Plans—No Delays. No Red Tags.
From small remodels to large commercial builds, we prepare complete, permit-ready plans architecture, engineering, and paperwork included.
- Avoid red tags and delays.
- ✅ We speak Houston’s permitting language.
🚀 Ready to build without setbacks?
Get Approved Plans—No Delays. No Red Tags.
From small remodels to large commercial builds, we prepare complete, permit-ready plans—architecture, engineering, and paperwork included.
Avoid red tags and delays.
✅ We speak Houston’s permitting language.
🚀 Ready to build without setbacks?



From Red Tag to Green Light.
We fix code violations, draft what’s missing, and coordinate directly with city inspectors—so your project gets back on track.
- Floor plans (2D layouts for permit submittals)
- Elevations (front, rear, side exterior views)
- Site plans (lot coverage, setbacks, driveway position)
- Roof plans (roofline slope, drainage)
- ADA-compliant design (for commercial/public spaces)
- Zoning analysis and feasibility studies
Engineering
• Foundation plans (slab-on-grade, post-tension, pier and beam)
• Framing layouts (walls, joists, trusses)
•Lintel and beam calculations
•Lateral load resistance systems (wind, seismic)
•Roof framing systems
•Structural repair drawings for red-tagged work
• Engineering stamps for permit approval
Engineering
•Grading and drainage design
•Detention and retention pond plans
•Utility plans (sewer, water, electric connections)
•Stormwater Pollution Prevention Plans (SWPPP compliance)
•Driveway and sidewalk design (per Houston Public Works)
•Parking lot layout and compliance (for commercial projects)
•Erosion control drawings
Engineering
• HVAC layout and Manual J/S/D load calculations
• Electrical layout, panel schedules, and circuit maps
• Plumbing riser diagrams (water, DWV, gas)
• Tankless water heater layout and venting
• Commercial kitchen equipment MEP integration
• Title 24/IECC Energy Code compliance (if applicable)
•MEP as-builts for undocumented structures
- Space planning and functional layouts
- Cabinetry and millwork design
- High-resolution renderings (static)
- 3D modeling (walkthroughs and investor presentations
- Lighting plans and finish schedules
- Material boards for client approval
Expediting
- Application filing with City of Houston and surrounding municipalities
- Portal submissions and file conversions (PDF/digital)
- Tracking permit progress, responding to plan reviewers
- Re-submittals and corrections
- Certificates of Occupancy (CO) management
- Change-of-use permitting
- Special use permits and variances (when zoning conflicts arise)
- Site evaluation and scope analysis
- As-built plan drafting
- Correction plan documentation
- Field coordination with inspectors
- Safety upgrades and compliance retrofits
- Legal reports for insurance or resale purposes
& Platting
- Boundary surveys
- Topographic surveys (elevations and slope)
- ALTA/NSPS land title surveys (for closings)
- Elevation certificates (FEMA compliance)
- Platting for new parcels or lot subdivisions
- Replatting for lot combinations or easement changes
- Coordination with County Clerk and City Planning
From Red Tag to Green Light.
We fix code violations, draft what’s missing, and coordinate directly with city inspectors—so your project gets back on track.
Why EZPermitsTX

One-Stop Technical Team

Local Expertise

Speed = Savings
- Floor plans (2D layouts for permit submittals)
- Elevations (front, rear, side exterior views)
- Site plans (lot coverage, setbacks, driveway position)
- Roof plans (roofline slope, drainage)
- ADA-compliant design (for commercial/public spaces)
- Zoning analysis and feasibility studies
Engineering
• Foundation plans (slab-on-grade, post-tension, pier and beam)
• Framing layouts (walls, joists, trusses)
•Lintel and beam calculations
•Lateral load resistance systems (wind, seismic)
•Roof framing systems
•Structural repair drawings for red-tagged work
• Engineering stamps for permit approval
Engineering
•Grading and drainage design
•Detention and retention pond plans
•Utility plans (sewer, water, electric connections)
•Stormwater Pollution Prevention Plans (SWPPP compliance)
•Driveway and sidewalk design (per Houston Public Works)
•Parking lot layout and compliance (for commercial projects)
•Erosion control drawings
Engineering
• HVAC layout and Manual J/S/D load calculations
• Electrical layout, panel schedules, and circuit maps
• Plumbing riser diagrams (water, DWV, gas)
• Tankless water heater layout and venting
• Commercial kitchen equipment MEP integration
• Title 24/IECC Energy Code compliance (if applicable)
•MEP as-builts for undocumented structures
- Space planning and functional layouts
- Cabinetry and millwork design
- High-resolution renderings (static)
- 3D modeling (walkthroughs and investor presentations
- Lighting plans and finish schedules
- Material boards for client approval
Expediting
- Application filing with City of Houston and surrounding municipalities
- Portal submissions and file conversions (PDF/digital)
- Tracking permit progress, responding to plan reviewers
- Re-submittals and corrections
- Certificates of Occupancy (CO) management
- Change-of-use permitting
- Special use permits and variances (when zoning conflicts arise)
- Site evaluation and scope analysis
- As-built plan drafting
- Correction plan documentation
- Field coordination with inspectors
- Safety upgrades and compliance retrofits
- Legal reports for insurance or resale purposes
& Platting
- Boundary surveys
- Topographic surveys (elevations and slope)
- ALTA/NSPS land title surveys (for closings)
- Elevation certificates (FEMA compliance)
- Platting for new parcels or lot subdivisions
- Replatting for lot combinations or easement changes
- Coordination with County Clerk and City Planning
Technical review + custom quote.
Red Tag? We’ll Turn It Green—Fast.
Includes:
- Review of the client's situation (red tag, expansion, new project, etc.)
- Basic compliance assessment
- Guidance on which plans or services are required
- Preliminary estimate of cost and management time
Planning a remodel? We’ll handle the permits—start building with confidence.
Why EZPermitsTX

One-Stop Technical Team
Engineers, architects, and drafters all working in sync

Local Expertise
Engineers, architects, and drafters all working in sync

Speed = Savings
Engineers, architects, and drafters all working in sync
Our Projects
Real Projects. Real Permits. Real Results.
EZPermitsTX provides tailored solutions to navigate building codes, solve technical challenges, and secure permits on time. They work on residential, multi-family, and commercial projects in the Houston area, coordinating with licensed professionals to ensure accurate and compliant plans. The images showcase examples of their work, from code corrections to full permit sets.
Planning a remodel? We’ll handle the permits—start building with confidence.
Our Projects
Real Projects. Real Permits. Real Results.
At EZPermitsTX, each project reflects a tailored approach to navigating complex building codes, solving technical challenges, and achieving permit approval on time. Our portfolio includes custom residential additions, multi-family conversions, commercial buildouts, and red tag corrections across Greater Houston. Every plan we prepare is coordinated with licensed professionals, reviewed for compliance, and submitted with precision. The images below showcase just a few of the spaces we’ve helped bring to life—from code correction drawings to fully engineered permit sets.
Trusted by Property Owners, Builders & Developers
EZPermitsTX handled our entire permit process—from drawings to final approval—faster than we expected. Highly recommended!
We had a code violation and no plans. They drafted everything, coordinated with the city, and got us back on track in just days. ¡Impresionante!
We got red-tagged mid-project and had no idea what to do. EZPermitsTX sent an engineer, drafted the correction plans, and got us cleared in less than a week.
Submitting permits used to be a nightmare. With EZPermitsTX, we got stamped drawings, MEP plans, and approvals—all in one place. Saved us weeks.
Get Approved Plans
Code Violation?
We’re On It.
When a code violation notice hits, time matters. Our team was called in immediately after a City of Houston red tag—and within 7 days, we had the corrected plans submitted and under review.
We help homeowners, builders, and developers fix violations fast and get projects back on track.
Need help now? Call for a Free Compliance Review.
No delays, no problems.
Start your project without delays or unexpected setbacks.
Let us prepare your plans, solve your code issues, and handle the paperwork. From the city to the field—we’ve got your back.
Let’s Plan It Right
Tell us about your project. We’ll show you the best way to get approved